EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Duckie
-
Listing for Category : interior finish
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (188)
Research
Workshop
- (2)
-
Moved plane inside
-
Bought Duckie
Empennage
- (2)
-
Cut wheel axles
-
Removed t-tail bumps
Fuselage
- (18)
-
Installed canopy...
-
Designed canopy...
-
Installed Canopy Hinge
-
Applied 2 extra...
-
Cut bottom open for...
-
Investigated warped...
-
Repaired all aileron...
-
Created arm rest...
-
Assembled rudder pedals
-
Primed interior
-
Cleaned, sanded...
-
Test fitted engine...
-
Trimmed firewall more
-
Made baggage hole...
-
Microed canopy seam
-
Installed baggage...
-
Remounted tail section
-
Fiberglass Day
Firewall
- (7)
-
Finished wiring in...
-
Installed firewall...
-
Painted firewall
-
Closed off firewall...
-
Made firewall box
-
Installed engine mounts
-
Drilled engine mount...
Tail Feathers
Wings
- (2)
-
Added sparrow...
-
Polished wing,...
Controls
- (27)
-
Replaced ELEVATOR...
-
Changed light spring...
-
Installed new brake...
-
Checked travel for...
-
2nd Taxi Test
-
Redesigned, rewelded...
-
Fixed rudder wobble
-
Finished brake install
-
Redesigned rudder...
-
Bled brake lines
-
Finished...
-
Installed aileron...
-
Installed all tail...
-
Installed elevator trim
-
Installed rudder...
-
Installed Trim Wheel...
-
Installed rudder...
-
Added bell crank in...
-
Made bell crank
-
Installed new...
-
Installed u-joint...
-
Made & Installed...
-
Cleaned and...
-
Test fit reflexor
-
Installed control...
-
Removed elevator...
-
Removed corroded...
Avionics
- (21)
-
Upgraded Falken FDC...
-
Tested EGT & CHT...
-
Fixed EGT #2 connection
-
Tested Static &...
-
Moved GPS for better...
-
Mounted missing plug...
-
Covered all thru...
-
Made bracket &...
-
Installed 3 antennas
-
Made ELT tray
-
Installed FlightStick
-
Installed new...
-
Fix avionics...
-
Make wiring harness...
-
Installed batteries...
-
Finished panel...
-
Installed TXP/...
-
Started behind...
-
Finished alternator...
-
Ran battery /...
-
Glued in zip tie...
Lighting
- (2)
-
More engine wiring
-
Installed various...
Instrument Panel
- (11)
-
Mounted batteries in...
-
Ran static &...
-
Programmed EFIS values
-
Finished wiring for...
-
Metal cylinder...
-
Mounted ADC
-
Started panel wiring
-
Installed headset...
-
Added finger holes
-
Worked on CAD design...
-
Test fit panel &...
Landing Gear
- (12)
-
Swapped tires for...
-
Swapped tires for...
-
Installed Fobo BT...
-
Redid brake lines
-
Strengthened...
-
Changed valve to fix...
-
Installed brake...
-
Brake Line Install
-
Aligned wheel axles
-
Mounted new tailwheel
-
Cut brake opening
-
Installed tires
Engine
- (40)
-
Added air filter
-
Added baffling to...
-
Completed...
-
Continued...
-
Upgraded...
-
Made & installed...
-
Added metal tape...
-
Connected &...
-
Installed air intake...
-
Resin wiped lower...
-
Tidied Up Engine...
-
Torqued & Safety...
-
Torqued Spark Plugs
-
Mounted oil hatch
-
Installed AntiSplat kit
-
Installed exhaust...
-
Installed exhaust...
-
Finished rough...
-
Completed Plenum
-
Lots more plenum and...
-
Plenum & Cowling...
-
Adding intakes on...
-
Fit cowling
-
First engine run...
-
Installed prop...
-
Hung engine
-
Installed various...
-
Fixed bolts for...
-
Test hung engine
-
Torqued everything...
-
Installed more...
-
Continued engine...
-
Tapped fuel intakes
-
Installed oil screen...
-
Installed new oil...
-
Installed REAL...
-
Removed rudder...
-
Removed oil screen...
-
Mounted alternator...
-
Installed 2 of 4 new...
Propeller
- (6)
-
Prop Balance
-
Fixed safety wiring...
-
Installed, polished...
-
Safety wired bolts
-
Mounted new prop
-
Pickup propeller
Fuel System
- (11)
-
Calibrated fuel sensors
-
Fix soft spot on...
-
Installed fuel lines
-
Installed bottom tap
-
Closing main fuel tank
-
Fiberglassed in...
-
Molded new bottom...
-
Cut out old fuel...
-
Designed new fuel...
-
Floxed in header...
-
Installed main tank...
Interior Finish
- (7)
-
Installed air vent
-
Polished canopy glass
-
Installed arm...
-
Installed canopy gas...
-
Installed seat belts
-
Made glare shield
-
Installed arm rest...
Paint / Decals
- (10)
-
Various Little Updates
-
Finished paint &...
-
Labeled fuel fill
-
Label fuel fill
-
Installed N number,...
-
Panel anodized
-
Painted interior...
-
Primed interior and...
-
Painted rudder pedals
-
Primed interior
Inspection
- (10)
-
5 Hour Inspection
-
FIRST FLIGHT
-
Airworthiness...
-
Wrote POH &...
-
Redoing tailwheel...
-
Completed a W&B
-
First Taxi
-
Weight check
-
Weight fuselage
Tools
Builder Name:
Robert Schmid
-
Project:
Quickie - Q2
-
VIEW REPORTS
Total Hours:
1219
Start/Last Date:
Apr 29, 2022 - Aug 31, 2023
Engine:
O-200
Propeller:
Catto
Panel:
Falken Avionics, Uavionics AV-30, BendixKing AP, iPads
Friendly URL:
https://eaabuilderslog.org?s=Duckie
Home or Last Project Picture
Jun 02, 2023
Installed air vent
- (3 hours)
Category: Interior Finish
Connected flex hose to NACA vents on each side ... PIA placing and stuff in the way
Drilled and floxed in carbon tube to NACA vent for iPad mount air
Connected silicon hose from NACA vent carbon tube to iPad mounts
IMG_1549.jpg
May 27, 2023
Polished canopy glass
- (8 hours)
Category: Interior Finish
What a PIA
Used sanding system from ACS first
Then used polisher from Harbor Freight with other #3 and #2 polish out of bottle
IMG_1480.jpg
May 11, 2023
Installed arm padding & glare shield
- (4 hours)
Category: Interior Finish
IMG_1387.jpeg
IMG_1388.jpeg
IMG_1389.jpeg
IMG_1390.jpeg
May 06, 2023
Installed canopy gas strut
- (4 hours)
Category: Interior Finish
Floxed in 2 attachment points that don't interfere with carbon bar across
Went with 40lbs force strut from Amazon
IMG_1322.jpeg
Apr 23, 2023
Installed seat belts
- (6 hours)
Category: Interior Finish
What a PIA but after cutting extra access hole in center console installed and bolted in all seat belt fittings
Ken bent outboard connectors for me
I cut them down and drilled smaller 1/4 hole to fit existing attachment points
IMG_1202 (1).jpg
Nov 16, 2022
Made glare shield
- (16 hours)
Category: Interior Finish
Cut from G10
Mounted with clicos and then flush screws
Hard work to get to fit to panel top
Made tabs
9F10B90A-15F8-495F-8964-EFCE19BF9FF0.jpeg
C98AA1DF-1865-4E67-BF1D-F5B4138B52F5.jpeg
Oct 15, 2022
Installed arm rest hinge
- (2 hours)
Category: Interior Finish
PXL_20221015_232403561.PORTRAIT.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.